- Installation concepts
- Solutions for installations below projections
- Assembly under climbing scaffold with counter beam and vacuum suction system
Assembly under climbing scaffold with counter beam and vacuum suction system
- up to 10 to
- up to 5 m projection
Flexible climbing systems are often used in the construction of high-rise buildings in particular. The scaffolding moves upwards with the building. This method is very efficient, but it becomes complicated when the façade elements have to be installed during construction progress. In this case, the glass panes have to be installed under the moving scaffolding structure and the building projection.
Heavydrive offers a simple and safe solution for this. With the help of a counter beam, which is attached to a conventional construction crane, the façade panes can be accurately balanced and threaded under the moving scaffolding structure. The Heavydrive counter beams are available in different versions with a load capacity of up to twelve tons. The systems can be individually configured and combined with different suction systems. Heavydrive offers an extension for the counter traverse for installation behind large scaffolding or extremely deep building projections.
Rental/purchase prices: on request
- Glass construction
- Facade construction
- Window construction
- Plant construction
- Maschine construction
- maintenance of equipment