Data sheet
Assembly under climbing scaffold with counter beam and vacuum suction system
Services included
- Advice on rental, purchase and project planning
- Handling service
- Payment and financing options
- Fast and customised delivery options
- Long-term rental models
- Equipment replacement & spare parts service/li>
- Digital services
- Tested quality/li>
Optional additional services
- Express delivery
- Maintenance Plus
- Instruction/training
- Planning and advice service
- Device operator
- Handling Service
- up to 10 to
- up to 5 m projection
Long description
Flexible climbing systems are often used in the construction of high-rise buildings in particular. The scaffolding moves upwards with the building. This method is very efficient, but it becomes complicated when the façade elements have to be installed during construction progress. In this case, the glass panes have to be installed under the moving scaffolding structure and the building projection.
Heavydrive offers a simple and safe solution for this. With the help of a counter beam, which is attached to a conventional construction crane, the façade panes can be accurately balanced and threaded under the moving scaffolding structure. The Heavydrive counter beams are available in different versions with a load capacity of up to twelve tons. The systems can be individually configured and combined with different suction systems. Heavydrive offers an extension for the counter traverse for installation behind large scaffolding or extremely deep building projections.
Data sheet (climbing scaffold)
We handle all the necessary steps from the beginning to the end of the project.
Our products at work you'll find here:
references.heavydrive.com